Monday, May 18, 2009

Feedback: A Core Component of a Successful Process


Processes comprise of a functions which operate on inputs to produce outputs. Data associated with the inputs and outputs can be used to further enhance the process quality. The data related to the process outputs could include important elements that when fed back to the input within a solid analytical framework could offer valuable insights and impacts on the process improvement.

Several key steps in designing the appropriate data collection, analysis and feedback system are summarized below:

1. Decide where to collect the data
Data can be collected at the input, various processing points, decision-points, at the output or any combination of all of these locations.

2. Decide what measurement systems to use
Various techniques exist to collect and measure data. Decisions need to be made on best statistical approaches, summarization techniques, collection methods and the levels of accuracy and precision needed.

3. Decide how to analyze the data
Approaches of data analysis need to be determined. It is important to determine cause and effects, root causes, correlation, regression dependencies and other relationships among the various variables and factors.

4. Decide on how to use the information resulting from the data analysis
Decisions related to the application of the information learned is important. For example will information be applied in real-time, or after process reengineering is brainstormed.

The Cruiseterminal - The World's Floating Dock

Even by Dubai's standards the Cruiseterminal is an extravagant project. Rigged to a foundation in the Persian Gulf it can host three of the largest cruise ships. Its an integrated system comprising of its own photovoltaic electricity generation subsystem, an entertainment and retail subsystem, a 180 room lodging subsystem, docks for tens of smaller boats.

A system such as the cruiseterminal brings new challenges not only to system design and development, but also system operations, support and maintainability.

To check pictures of the Dubai floating Cruiseterminal among other structures, check De51gn at http://de51gn.com/design/the-floating-world-of-koen-olthuis/

Wednesday, April 29, 2009

Using the Theory of Constraints & Six Sigma to Fix Critical Components of the Economy


Constraints are all around us. The theory of constraints is a lean problem-solving concept based on a simple concept, that a process can not move faster than the slowest part of the process.

Our economy as a complex enclosed system has constraints and it will respond to stimulus as quick as the slowest link in the economy. The chart on the left illustrates some major components of the economy. They all need to be improved for the stimulus to realize benefits, otherwise it will be a temporary patch.


The root of the problem lies in three areas:

1. The concept of printing money and the process followed to release cash into the market. The Federal Reserve Bank - which is not a government entity - is provided the authority to distribute the nation's currency and supervise banks which are members in the system. When the US releases currency into the market it requests the Federal Reserve Bank to print dollar bills in return for an interest payment on the amount. No real assets are provided as collateral to backup the value of the printed currency. The value of the currency is only backed up by the reputation and promise of the US government to accept the currency as a form of payment. As users of the currency lose faith in the governments ability to keep the promise the value can drop significantly. One reason for the poor confidence in the currency, is the automatic depreciation of the currency the day it was printed. For every US dollar printed a small percentage is due to the Federal Reserve Bank as interest on that printed dollar, in a sense every dollar released into the market is really worth 0.98 of a dollar, if we assume an interest rate of 2%. Add onto this, the fact that the US government is running into a non-stop deficit in social security, and other areas leading to increase in bond issuing to countries such as China and India, further diminishing the value of the US currency.

2. Interest rate or usury is another problem in the overall system. The fact that currency value depreciates today based on some future value determined by an interest rate automatically leads to inflation, and future depreciation of natural resources. Charging interest is like pumping steroids into a body builder, eventually at some point the body will collapse.

3. Selling what we don't own. The idea that goods and services can be sold without actually owning them creates a virtual commodity system, not backed up by real commodities or assets.

Unless these areas are fixed no stimulus package can work on the long term. Some simple steps to address this issue are:

a. Identify the constraints of the financial and monetary systems
b. Exploit the constraint or re-engineer
c. Subordinate other steps in the overall process to the improved constraint
d. Revise the constraint if it has not been eliminated by steps b and c
e. Repeat the steps above for other constraints

Applying this into practice can be as follows:

a. Identify the constraints of the financial and monetary systems
- Currency not backed by a true tangible asset (some natural resource like gold or silver)
- Currency being depreciated the day it is printed, solely due to interest
- Distribution and sale of products that do not exist (example lending money to a business when the bank does not have the exact cash reserved, selling a commodity that one does not own and has not yet paid for)
- Using interest rates to discount projects, assets and commodities to a future value, leading to valueless future assets, commodities, natural resources

b. Exploit the constraint or re-engineer
- Re-engineer the monetary system that issues a currency based on a true asset and not just a promise
- Re-engineer the concept of future valuation
- Re-engineer the concept of wealth circulation

c. Subordinate other steps in the overall process to the improved constraint
- Use a sustainable natural resource to backup the value of an issued currency
- Use joint partnerships, gifting (0% loans) and entrepreneurship, moving away from interest bearing loans of money that is not owned by lenders.
- Base future valuation on true-value (value proposition) provided to global society rather than a discounted interest rate.

d. Revise the constraint if it has not been eliminated by steps b and c
e. Repeat the steps above for other constraints

Monday, April 27, 2009

One Way to Ruin a Great Product Idea - When Design and Implementation Miss





A friend of mine sent me some interesting pictures for projects that might have seemed successful on paper, when in implementation they failed. This is where a systems engineer comes in handy, in cases like these.

Saturday, April 18, 2009

A Financing System for Prosperity, Growth and Social Justice

My dear friend Mohamed El Habashy sent me a link to an interview that he was part of on PBS. He was one of several experts interviewed on hot topic of Islamic financing. It seems that the World suddenly woke up to realize that a system that was revealed to mankind some 1430 years ago is now all the sudden a good choice.

The Islamic financing system is based on one of three main models:

- Mosharaka (joint ownership through stocks, capital partnerships)
- Qard Hasan (good lending, a loan with no interest (0%) regardless of amount and maturity date)
- Mudaraba (entrepreneurship or partnership with effort and experience)

Several key concepts in Islamic financing are

1. Joint sharing in risk and reward (property/asset price increase and decrease) - is part of the definition of ownership in Islam, and it provides responsibility and fairness to all parties.

2. The concept of selling money (lending with interest) is prohibited. In Islam lending money as a form of investment is prohibited and not in compliance with the Islamic Shariyah.

3. Sales are only acceptable on items owned. This means someone can not sell an item (product, service, shares, commodity, etc..) unless he has paid for it in full and has full control on it. In Islam a person selling stocks that he never paid for is prohibited and not in compliance with the Shariyah.

As of today there are no 100% Islamic compliant financing vehicles in the US, the efforts mentioned above in the PBS article are good and trying to strive to get close to the fair and just Islamic financing. However due to regulations and other factors there are some gaps, such as the joint risk sharing in a partnership model. Islamic financing has been around for 1430 years from the days of Prophet Mohamed and it is implemented in many parts of the World (UK Links: 1, 2, 3, 4, 5) we in the US are just behind. There is a US institution that has started offering some Islamic vehicles.

There is no question that Islamic financing is fair, just and solid, providing fair social rewards to all parties involved, unlike other means of financing. Islamic financing can be used by non-Muslims as well whether they decide to fund or use the system.

Usury/interest was prohibited not only in the Quran, but Jesus and Moses were ordered to tell the people to not engage in usury. (proverbs 28:8, Ezekiel 18:8, Exodus 22:25)

Friday, April 17, 2009

Finally America Might See a High Speed Rail System, or Might It Not

It's not about time that America gets a high speed rail. It is way past due. Japan had one for decades, and Europe has been there, did that ages ago.

These days there are discussions about two impressive high rail initiatives worth mentioning. In the West Obama is pushing for $13 billion ($30 billion total cost) high speed rail system (links 1) in California and the heart of America's Mid-West, Chicago, my favorite city. In the East King Abdullah is launching a high speed rail route between Makkah and Madinah.

Wikipedia has compiled a list of high speed rail projects across the globe. The Saudi project is impressive as it has the least cost / mile worldwide. The American is impressive because it is the first in the Western Hemisphere and second fastest worldwide reaching a little over 150 miles / hr.

Now here is the big project. China's high speed rail, the longest worldwide reaching over 800 miles and exceeding the American train speed. A really neat chart showing the world's top high speed projects can be found at infrastructurist.com by Yonah Freemark.

So the questions that pop up are: Why did it take America too long to initiate such a project? Will it be a success or another Acela (links 1, 2) Successful system development is contingent on many factors some of the critical ones are policies, supporting infrastructure, overall cost, stakeholder value proposition.

So why do I consider Acela a failure (1) Well, for one it was a very expensive system, secondly, it did not take away much volume from other modes of transportation. If it takes me an hr to drive from my home to get to an Acela station in Washington DC so that I can get to New York City in a couple of hrs, I might be better off driving up to New York in 2.5 hrs and pay less in gas and have the convienence of my own transportation in all the other pockets of cities and suburbs that lack public transportation. Just one of many aspects of the overall system that needs to be considered.

The boundary of a high speed rail system does NOT stop at the tracks, it goes beyond the tracks and stations to the supporting infrastructure that will allow people to get to the high speed stations, use the facilities and services within the service levels and value proposition a stakeholder will expect.

Thursday, April 16, 2009

New PMP Practice Book Released Today



I just received a proof copy of my new PMP practice book today. The book is a great tool for those who prefer the self-study route. It comprises of 15 chapters covering the concepts of project management, a project's life cycle phases, process groups and project domain areas (scope, schedule, cost, risk, communications, risk, procurement, quality, human resources and integration). It also includes a chapter on professional responsibility, and a chapter with extra 130+ questions. The whole book offers over 420 practice questions very similar to the exam. The book is not a study guide (it does not have content to study, just problems to practice), it does have a chapter on how to prepare for the exam and various tips ranging from "how to get to the test center" to "how to respond to questions"

It can be purchased online from https://www.createspace.com/3380201 or from Amazon.com

Wednesday, April 15, 2009

Tools Alone Produce Fools

Managing a project or defining a complex system requires the knowledge and skills of appropriate methodologies and processes to realize the objectives. An individual who only knows how to use a project management tool (see selected list of tools in the sidebar), but lacks the understanding of the iterative and progressive nature of projects and how to manage the different processes within each phase will not be able to lead a successful project.

There is a big difference between developing a schedule that works and a schedule that looks good in a tool. Expert project managers need nothing more than a pencil and sheet of paper to lead a project. Tools help automate calculations and enable updates and corrections easily, allow tracking of changes and ensure a controlled environment that is agile and flexible. Tools do not defie methodologies, approaches, strategies, or plans. Tools do not execute, monitor or control and tools do not communicate, coach, inspire, motivate and collaborate. Only project managers do.

Are your pencils sharpened?

Friday, April 03, 2009

High Availability Systems Failure


Does your business require availability capabilities? In today's complex business landscape and the demand for high accountability and transparency, high availability becomes a basic requirement in operations, information access and decision-making.

Interestingly most high availability environments that fail are unable to deliver the expected results no because of technology immaturity, but mostly due to poor management and oversight. A publicly known example is the State of Texas data loss as a result of invalid checks and balances and inappropriate technical management. In this particular case according to the article in the Dallas Morning News IBM has been fined $5.4 million. Of that, $2.7 million was for failing to resolve problems quickly and $1.2 million was for server outages. Data backup breaches, missed mail deadlines and taking more than 15 minutes to respond to serious incidents accounted for the rest, according to department records released this week.

Next time you implement a high availability solution, do not get fooled by the latest server technology, data backup system or disaster recovery tools. A high availability technology with a staff member who can not use it makes it useless.

Thursday, April 02, 2009

Maryland is First in the Nation to Reach Recovery and Reinvestment Act Milestone


States are required to meet certain federal guidelines and requirements to be eligible to use recovery funds allocated to the State. On March 23rd, Maryland reached this milestone. According to the State of Maryland Governor's website, "Phase I of Maryland’s ARRA funded highway projects totals more than $224 million and has the potential to support up to 10,000 jobs".

On the top of President Obama's priorities are business integrity and fiscal responsibility. Vice President Biden has been assigned this responsibility. This will drive the need for certified project managers and professionals by contractors to ensure best compliance possible with sound business practices and accountability standards.

This is a great time to get PMP certified for professionals interested in pursuing recovery act projects. I am offering several workshops soon.

Tuesday, March 31, 2009

Risk Management Through Coaching

To manage risks on a project we tend to follow various processes such as planning for risk management, conducting qualitative and quantitative analysis, and responding to risk. These processes include specific details such as the definition of a risk, risk triggers and thresholds, steps the team will take to identify risks, the classification and groups of risks, risk prioritization and many other little details. These processes work very well - when implemented correctly of course - and are successful in avoiding the negative consequences of a potential risk should it occur.

Besides these well known and understood project management, agility or systems engineering processes, coaching and mentoring is another powerful tool for risk management. Having another project manager as your coach allows you to get a fresh insight on project health and can hold you accountable in an informal manner to project goals and aspirations. Your coach acts as a friendly auditor and makes collaboration even fun.

Next time you manage a project don't forget to have a coach or buddy, whom you trust. You will not only gain some insights on your progress, but you will also be motivated to raise the bar.

Monday, March 30, 2009

External Project Risks More Important than Ever

As the economy becomes more challenging and the impact of globalization increases project risks become more in number and impact. Moreover external risks are closer than before. Examples of external project risks that have become much more visible during the downturn and that project managers should start accounting for if they haven't already are:

- Fluctuating currency exchange rates
- Labor issues (strikes, layoffs)
- Regulation changes
- Customer investment and purchasing changes
- Contract breaches
- Financing and investment opportunities

Thursday, March 26, 2009

3 Ways To Guarantee a Failed Product


I was at the county jail a few weeks ago coaching a group of young men on strategies to transition back into society. I asked them two questions, the first list 3 goals you would like to accomplish during your lifetime, things you will be proud of in the hereafter. They jotted down some goals on 4*6 cards. The second question was list 3 things that if you do, you are 100% sure that there is no way you can achieve these goals, it will be impossible to achieve them. I gave them a few minutes and they all had a few points to share.

One example of a goal that was shared was to get back to education and enroll in college, get a degree and be a productive member of the society. The young man noted involvement with illegal substance to be a factor not allowing him to realize this goal.

Developing successful systems follow the same pattern. We need to understand user requirements, the utility of the system, why is the system needed, what value is the system offering, the gap it is filling. Once that goal is clear and understood, we need to make sure we protect these requirements from "outside noise", what is also known as scope creep. Scope creep is for sure a main reason why projects fail, it is when we add requirements, remove requirements, or just change requirements in an uncontrolled fashion, without going back to understanding the rationale and true value for doing so and relating it to the project's objective, cost and schedule.

Reason 1: Low Quality Requirements and Scope Creep - Uncontrolled Changes

A second young man in the group shared his goal was to be a successful businessman offering valuable services to the society. He noted down that unethical dealings would be a reason to ensure he never accomplishes his dream. I advised him that to overcome this hurdle he needs to continuously gauge his relationship with his Lord and measure his values and ethics. If he notices that his relationship is getting weaker, he needs to take corrective actions.

In the domain of systems development we call that validation and verification. Is the project still valid? i.e. is it still delivering what it was originally intended to deliver. And is the work correct? Can we verify that the work is what was expected earlier at the beginning of the project, through testing, and if it is not correct, can we take corrective actions to resolve defects. This validation and verification needs to be conducted throughout the whole life cycle of the product, and not just near the time we turn it over to the client, otherwise the deviations from the expected results could be huge, leading to costly modifications, schedule slippage and possibly a failed product.

Reason 2: Not Considering Validation and Verification Early in the life cycle of the product - Developing the wrong product, or developing the right product incorrectly

A third person shared that his goal was to be a teacher, nurturing young minds not only with knowledge but the application of the knowledge and its purpose. I reminded him to share with his future students trace back the purpose of the knowledge they learn from him, to the purpose for which we were created. Everything we do needs to serve the purpose for which our Lord created us.

Similarly, in the domain of product development, we can that requirements traceability. How do the original requirements defined by the client relate to design work, development work, testing and final product features. It is important that throughout the life cycle of a product we maintain a clear trace of how the work we are currently involved in relates back to what the customer needs.

Reason 3: Poor Requirements Traceability - Missing some Requirements in Implementation, adding Features not Needed, or both


Make sure if your customer asks for a mule, you deliver a mule as expected, and not a cow. Although a cow has plenty of benefits and utility, it might not serve the need satisfied by a mule.

Wednesday, March 25, 2009

7 Tips for Engineering Students


I often get questions or concerns from engineering students about studying and being able to pull through college to reach their goals of becoming engineers. I have to admit going through engineering school is no light challenge, but at the same time it is an enjoyable experience.

Common comments are concerns of not being able to understand the questions in an exam, or not able to go through the needed steps, or just finding subject matter too complicated.

Here is my advice for of these folks and other future engineers.

1. Understand that engineering is all about problem solving for the betterment of humanity, through the use of scientific facts. This means that a good engineer must,
  • understand what the problem is (how it happens, why it happens, when it happens, where it happens)
  • analyze the problem - visualize it (use a pencil and paper to sketch, engineers are born to sketch)
  • determine its scope - (how big is the problem, who does it affect, under which conditions)
  • determine what information is given to us (data, assumptions, facts)
  • learn the sciences (calculus, physics, chemistry, etc..) to use in problem solving
  • apply these sciences to the appropriate solutions for the relevant problems
2. Never memorize, engineers are thinkers. Anything you learn must make sense to you. You must understand why a theorem or rule is the way it is, how it came to be so, this will help with critical thinking, and will enhance information retention.

3. Do not depend on calculators too much, understand how calculations occur, understand how the value for the various engineering functions are calculated, the meaning behind a differential, or integral, etc.. Then use the calculator to just speed up calculations - remember a fool with a tool is still a fool.

4. Develop mini-processes for yourself of things to do when you analyze engineering problems, make these processes adaptive to suit your thinking styles, analytical abilities and memory capabilities.

5. Practice makes perfect. Just like spending ours in the gym pumping those muscles up, or on the court perfecting those slam dunks. Engineers need to practice solving various types of problems (easy one, long, ones, short ones, complex ones, complicated ones, straight-forward ones, etc...).

6. Be organized - learn how to manage real-estate space on your paper. Organize data, analysis, scratch notes, results, conclusion in clear separate sections of your sheet. Be a good communicator, improve your writing and verbal skills, to allow you to effectively communicate your solutions to others.

7. Love the subject matter. You can never solve a problem, you don't care about. A good engineer can never design a bridge if he cares more or less of the importance of crossing the river. Love it, adore it, live it, immerse in it... be the engineer !!

Wednesday, March 18, 2009

Iterative and Incremental - We Have Something to Show

On projects which follow a waterfall methodology and run into project delays, usually there is nothing to demonstrate to the client. This is a little different with iterative and incremental methodologies. Iterative meaning we repeat the life cycle processes over and over, with an incremental addition in each run. With iterative and incremental development a delayed project can demonstrate an artifact to the client. It might not be everything the client wished for, but it is there.

Iterative and incremental methodologies provide higher levels of confidence to project sponsors, who would be more willing to extend investment in a troubled project than a project with no output at all.

Agile methodologies embed iterative and incremental approaches. Examples are Rational Unified Process (RUP), SCRUM, XP and others.

Great leaders know how to scope these increments and how often should they come out. For example lets consider a generic problem well know to everyone, the current economy down fall. This problem does not have a one shot solution. A $700 billion stimulus plan will not solve it for once and for all. It is just an iteration that will yield some results in 18-24 months, to keep things afloat. Most probably another iteration will be needed to sustain some of the new initiatives started in increment 1, and so on.

We apply iteration and increment processes in our daily lives as well. When we go to the grocery store to purchase soup, we don't purchase 100 cans of soup for the full year, even if we could successfully store them and pay for them. We purchase maybe 5 or 10 cans for a week or two, we then repeat the grocery purchasing process in one or two weeks.

Reasons for iteration are many,
(a) gain confidence in an experience to decide whether to repeat it or sustain it or not
(b) streamline cash flow
(c) simplicity
(d) effective time utilization
(e) limitation in resources
(f) shorter demand cycles (time to market, constituent demand, etc..)

Thursday, March 05, 2009

Effective Project Management in a Snipit


What are projects all about? A project is about delivering capabilities on time and within budget. So you are hired as a project manager at company ABC to ensure that their new product can be developed within the next six months and within budget as defined by the product team.

To ensure the delivery you need to accomplish a few basic items. Most people don't even do this bare minimal checklist below.. and guess what they wonder why their projects are among the 60%+ statistics of failed projects.

a) Understand the problem/gap the product is offering to solve (ie understand the value of the end product)
b) Define the project scope (schedule, cost, capabilities, stakeholders, assumptions, dependencies and risks)
c) Put together a good team that compliments each others skills, abilities and knowledge.
d) Define all work items that are needed to make the capabilities (product) delivered, in a hierarchical format (aka work breakdown structure - WBS), detailed to a level that can allow weekly reporting on the status of work completed
e) Define activities and their duration and resources needed to accomplish the work defined in the WBS, and come up with a schedule and cost budget.
f) Track the work completed relative to the cost and time spent to date and as planned. Are your cost and schedule variances healthy?
g) Know and track your risks throughout the project and mitigate as your move forward.
h) Ensure changes are controlled and tracked along with risks, issues, cost and schedule health.

You can be comfortable that you have a good chance of delivering your end product. Of course there are other details, but for the most part this is the backbone, if its solid, your project should be able to make it to the finish line.

Volunteer Team Members on Your Project?


Have you ever run a project that is solely or mostly running on a project team of volunteers? I was presenting to a group of program directors in the research field. Their dilemma is that they manage projects which have team members fully run by volunteer researchers from other organizations.

After comforting them that they are not the only people in the world that run projects fully dependent on volunteers, but rather they are part of the millions of teachers, religious groups, social service groups, civil rights, good citizens, and dozens of professionals who donate their time and expertise for the good cause of the World .. they became more relaxed.

So back to their challenge... How to get a volunteer - someone who is not paid, not officially or legally bound, not under your authority or control - to do their part on the project as a team member?

Answer is simple: Motivate and ensure the value they are interested in by doing this good will is present and did not disappear.

I have managed and coordinated tons of projects such as the one we are talking about. I also participated in tons where I was a team member. Bottom line --- as long as there is volunteer value. They will not only stick around, but will produce exceptional value... let it evaporate and before you know, they are all gone.

Example: Project X: Goal is to initiate, launch, implement and supervise a series of monthly community dinner at a Muslim community. Volunteers who are interested in being part of this project will most probably join for one or more of the following reasons,

a) they like food, food events, cooking, or have some passion to food
b) they like social gathering and chatting with others, like to be part of a group, or big family
c) they respect organization and like to see these events well organized and a god experience for every one
d) they just want to help out a community they belong to and enjoy being part of

So as a project manager, you know that all these volunteers are not getting paid, have very limited time, might live far away, but are interested in helping out, because they told you. As long as those 4 items above are maintained, they will keep coming. Now when something happens and for example these volunteers are no longer allowed to cook and bring in their own meals to share with others... they will not come because point a) is not longer available. Or if they feel that participants dont get along together and some tensions arise then they will stop again because point b) is no longer available... and so on.. you get the point.

So in a nutshell project manager need to have strong emotional intelligence skills and keep their eyes and ears open to what the volunteer team members are interested in and how much of it is on their projects.

Back to the volunteer researchers from all across the country that are on Bob's project (not real name). As long as the researcher's can add their work to their tenure requirements, paper portfolio, get academic recognition, be known as a participant, be respected for their knowledge and ideas, be able to have open communications with other scientists..... they should stick around.

Successful teams develop because they strive for the carrot, regardless what form the carrot takes.

Thursday, January 29, 2009

Enterprise Architect vs. Service Architect

If you open any book on SOA you find it defined as an architecture which offers a framework for improved business - technology alignment. In [1] SOA is defined as "a framework for integrating business processes and supporting IT infrastructure as secure, standardized components - services - that can be resused and combined to address changing business priorities". The IBM SOA Foundation [2] defines SOA as "the practice of deriving an information system design from a business design".

I find both definitions to be confusing and incomplete. The first definition is basically an enterprise architecture (EA) framework, right? The definition that it is a framework means that it defines governance, perspectives (views) and/or some methodology. Similar to TOGAF, or Zachman (does not have a methodology) or other well known architectural frameworks. TOGAF which is a framework for enabling the design, evaluation and build of the right architecture for an organization [3] offers an enterprise macro level architectural definition. TOGAF defines four main domains - business, data, application and technology. Well, the answer is not quite right. SOA is not EA, SOA is applicable at a level lower than the enterprise, it is focused on the service level, wherever it might be. In some cases services could be enterprise-wide and high level, but most of the time it is local.

Lets think of SOA as the "service instantiated" architecture for an enterprise architecture. To make it easier to understand lets take the example of a small non-profit community center. An enterprise architecture for this community center is the evaluation, definition, design and build of an integrated structure unifying the community center to allow it to achieve its mission. For example an enterprise staff appraisal system as part of that architecture. On the other hand SOA will define how the various services related to a staff performance system can be designed in IT resources and aligned to the business goals. Services could be "Staff Feedback Solicitation", "Performance Appraisal Metrics Definition", "Performance Appraisal Metrics Assessment", and several more. So in a sense SOA is addressing the question of "now we have an enterprise wide structure and method to appraise staff performance, how can we actually turn it on, and customize it for different departments, with optimum reusability of approaches and resources.

Other definitions of SOA is that is it is "a methodology and approach that can be utilized to deliver or to support an enterprise architecture initiative" [4].

______________________________________________________________
[1] Norbert Bieberstein, Sanjay Bose, Marc Fiammante, Keith Jones and Rawn Shah, " Service-Oriented Architecture (SOA) Compass: Business Value, Planning and Enterprise Roadmap, IBM Press, 2006.

[2] Rob High, Stephen Kinder and Steve Graham, "IBM's SOA Foundation: An Architectural Introduction and Overview", IBM Business Consulting Services, Version 1.0, Nov 2005.

[3] The Open Group, "The Open Group Architectural Framework (TOGAF)", Version 8.1.1, Enterprise Edition, 2007.

[4] Niel Maehiter, Quote in an Article titled, "What's the difference between SOA and enterprise architect?" by Joe McKendrick, June 11th, 2007. (link)

Wednesday, January 21, 2009

Metrics for Defining the Complexity Level

I was sitting in a meeting when a whole bunch of folks started sharing ideas on how to assess the level of risk associated with a project or system under development (SUD). Some thoughts were to consider the number of requirements, others the number of change requests needed, and some suggested the level of engineering support needed for a requirement to be realized, for example does the requirement call for an architectural change, design change, development change, or just test or only support during testing.

I agree with the last proposal, analyzing the scope of changes is a good way of defining the complexity and hence the risk of the project, then we can create metrics that reflect these different levels of engineering support. Merely looking a total number of requirement, change requests or development teams involved might not provide the most accurate assessment. Instead, the system architecture needs to analyze and study the requirements impact and assess design complications, development challenges, testing validity and deployment issues. This integrated view can provide a more objective feel for the level of complexity involved in the SUD. A system might have only two system level requirements that drive the whole architecture change and hence brings in large design, development, testing, deployment and support efforts, compared to another system which has 2 dozen requirements which marginally impact development and will hence have a much lower effort in other areas and less overall complexity and risk.

I came across some interesting articles and papers on this topic.

A Complexity Assessment Methodology for Programmable Electronic Mining Systems
Software Complexity Measurement
Design Complexity Measurement and Testing
A Function Point Method for Software Complexity Measurement

How do you assess the complexity of a project in your environment?

Monday, January 19, 2009

A System for Complex Event Management

It is expected that about 2 million individuals will visit Washington DC on Jan 20th. This will not be the largest event that draws pedestrian traffic. Each year Saudi Arabia hosts over 3 million pilgrims in Makkah and its surrounding areas for the Hajj worship activities. The Saudi's can attest that is is by no means an easy job, to keep the crowds safe, moving and able to do what needs to be done with ease.

The inauguration is a little different and less complex that Hajj in a sense that the largest part of the event is confined to the Mall and mostly static - i.e. folks are sitting or standing to witness the President as he gives his speech. Whereas, the Hajj is a more dynamic experience. Pilgrims move back and forth between Makkah, and the nearby mountain of Arafat and the valley of Mina on the outskirts of Makkah, 8 km away. Among the pilgrims are also celebrities such as Presidents and leaders of Muslim countries, businessmen, athletes, scholars and other well-known public Muslim figures who have intended to perform their pilgrimage. So the complexities of the inauguration might be much simpler than that of Haj, yet the organizers and teams overlooking its management have put a great deal of effort in organizing it that is worth discussion.

I share a few images - courtesy of the Washington Post - of how the event is organized illustrating security checkpoints, seating areas, entrances, exits, rest areas, vending, etc.. You can call these mission diagrams or context diagrams, at the end of the day the represent the high level architectural overview, which is worth appreciating as it reflects the amount of effort out into managing an event effectively.

The Saudi Government as well has recently taken extra ordinary measures to control the Hajj traffic and ensure safe experiences for the pilgrims. What is interesting is that the Hajj planning never required the closure of any streets in Makkah near or around the Holy Kaaba, unlike the inauguration plan, nor has it required security checkpoints such as those in the inauguration, other than guards at the entrance of the Grand Sacred Mosque for visual inspection.

This is a very interesting domain that is worth research, and I am sure there is a lot to learn from both the Saudi and American experiences.

Update: 3/22/09 - There is a discussion on linkedin related to major event management, you can follow it here, if you are member of "Project Manager Link" group.